The transformer is being transferred from the BCC Delaware to a mammoth Trail King trailer and will be transported to the St. Lucie Nuclear Power Plant by McTyre Trucking Co. Inc. of Orlando. The transformer is scheduled to leave the Port of Palm Beach early on Saturday, November 6, 2010.
Port Chairman Blair Cilkin was pleased that “the Port of Palm Beach had the capacity and flexibility to facilitate the delivery of this transformer which is a vital component in ensuring that south Florida has a reliable power supply.”