After completion of piling foundations for a windfarm park in the Irish Sea, StederGroup, a member to the Cargo Equipment Expert CEE network in The Netherlands, was ordered to arrange the return transport of the giant hammer set consisting of a 150 mtons hammer and a 165 mtons sleeve and accessories. Steder Group chartered a coaster vessel with very little draft to load and unload at the required ports. The coaster vessel arrived just in time to receive the hammer set from the drilling platform returning from the job in the port of Mostyn. After a 3 days journey, the cargo was safely offloaded by sheerleg, arranged by StederGroup in Kinderdijk.