Jiangsu Sunshine International Logistics Co., Ltd, member to the Worldwide Project Consortium (WWPC) in China, reported about two projects they handled: Offshore Wind Farm projects
During July this year the company managed the movement of 16 pieces steel tubular pile with  two types of large sizes and various weight: 74m x D 5m weight 501tons and 84m x D 2m weight 120tons. The scope of work was from ex work upto offshore wind farmwhich including overland transportation, port loading and oceancarriage. Meanwhile this operation was under way the company was awarded another project (same size and volume) for a different windmill farm. And additional a 40 sets of offshore wind farm equipment project was also awarded to Sunshine in July after Jiangsu had completed the prior movement of 37 sets of offshore windmill equipments ex work to jobsite sucessfully. Seven boats ex from Shenzhen to Tunisia
The experts from Jiangsu Sunshine also handled seven boats from the manufacturers Zhuhai factory upto Rades, Tunisia. The boats got loaded onto an oceanvessel in Shenzhen.  This was a time sensitive project with many other specific requirements such as special insurance requirement and special operating requirements in both end. In a short time, Jiangsu provided a cost-effective solution and matched these requirements. The cargo picking up, customs clearance and loading onboard a chartered oceanvessel was completed in two days only. The seavoyage was booked for a direct sailing to Rades in Tunisia.