​Weighting upto 122 tons per piece the tank-modules got transported by special trailers from Dudweiler to Saarbrücken Port where loading onto two chartered Mosel River vessels took place. Kübler’s road transport had to maneuvre a considerable distance against normal traffic direction, twice the security rails on the roads had to be crossed, a great number of traffic lights had to be dismantled and a railway tunnel with only 10 cm airdraft had to be cleared. More than 100 stopsigns and cut-off trees assisted to get this transport organized safely and on time.