The skills of Volga-Dnepr Group’s Engineering and Logistics Centre (ELC) were called into action to develop special loading equipment to transport a 30-ton ‘drum’ for desalination of drinking water from Dusseldorf in Germany to Kuwait City.
“This 10-metre steam drum for the oil and gas industry was both heavy and outsize and it was not equipped with tie-down points for its flight onboard one of Volga-Dnepr Airlines’ Iluyshin-76TD-90VD aircraft. To distribute the weight, we developed two small, light cradles and installed the cargo onto them. We also fitted the drum with special devices to enable us to meet the mooring safety requirements and fix the drum inside the cargo hold of the aircraft. The loading was completed using two cranes and a trailer. This solution was previously considered by the engineers of the customer. As a result of this preparation work, the steam drum was delivered on-time to the customer in Kuwait city,” said Evgeny Venikov, Load Planning Manager, Engineering and Logistics Centre, Volga-Dnepr Group. The flight was operated on behalf of the international forwarding and logistics company, Panalpina.