Berge Bulk has selected Deltamarin to carry out the ship side basic design for installing BAR Technologies WindWings by Yara Marine Technologies onboard the 210,000dwt bulk carrier Berge Olympus.
Deltamarin has earlier carried out ship side concept design of the retrofit including the needed analyses for structural matters, stability, other ship integration related issues and sea keeping. Basic design work is direct continuation of the project and includes preparation of the design documents needed for class approval for the retrofit.

Daniel Chin, Berge Bulk’s Innovation Projects’ Management Lead says: “BAR’s WindWings system presents enormous promise, but also enormous challenges. We are confident that Deltamarin’s experience and familiarity with wind propulsion technology makes them our ideal integration partner to execute the installation of BAR wings onto our vessels.”