The project team at BATI Shipping & Trading (members in Turkey) have been busy at the Port of Derince loading drilling machinery destined for China.

The unpacked cargo had to be carefully loaded after a sensitive and specific loading plan formulated by BATI.

The total shipment reached over 1,000cbm / 400tn with the longest drilling units at 17m and 35tn each.