Hamburg’s state government approved a large-scale expansion of shore-based power supply in the Port of Hamburg. This will create the conditions for a shift from shipboard diesel power supply to ecological electric power during lay times. With this expansion, Hamburg is playing a pioneering role in the field of alternative power supply during ships’ lay times in port.
As the first port in Europe, from 2022 the Port of Hamburg will offer shore-based power supply both for cruise liners and mega-containerships. Shore-based power will be available for containerships at a total of eight connection points located at Burchardkai, Europakai and Predöhlkai. In addition, availability of shore-based power will be extended to all existing cruise terminals. A shore-based power supply point will be constructed at HafenCity - CC1 and Steinwerder - CC3. The first such unit for cruise ships in Europe has been located at Altona Cruise Terminal ever since 2016.

All shore-based supply units will be connected to the power grid, in future supplying vessels with regenerative current that will be converted at a central facility to normal shipboard 6.6 kV voltage and 60 Hz frequency, and fed to the connection points from there.
Use of shore-based power will make a significant contribution towards attainment of climate targets in the shipping sector. The investment totals around 76 million euros. Completion of the shore-based power units is planned for 2022, with regular operation from 2023.