Late yesterday, tugboat Meredith Ashton and a 240-foot deck barge loaded with project cargo became the first vessel in decades to dock at the rebuilt northeast-facing Berth 10 on the Clure Terminal Expansion pier. The 667-foot berth, along with northwest-facing Berth 11, opened for use following a $10.5 million reconstruction project completed in March 2025.
The new berths feature 1,200 lineal feet of steel dock wall, new bollards, and reinforced concrete decking. Their reconstruction increased overall vessel berthing and cargo laydown capacity at the Duluth Seaway Port Authority’s Clure Public Marine Terminal, which includes the original property and the adjacent 26-acre Clure Terminal Expansion pier (formerly Garfield C&D) on Rice’s Point.

Today, the pier offers 26 acres of cargo laydown space, four heavy-lift-capable vessel berths (including the recent additions of Berths 10 and 11) and on-dock rail service connecting to four Class I railroads. It serves as a key component of the region’s multimodal logistics hub, with Duluth Cargo Connect using it for dimensional and heavy-lift cargo handling. The pier also welcomed Duluth-Superior’s first oceangoing vessel calls in both 2025 and 2026.
“The transformation of this pier from abandoned relic into a thriving, modern hub for heavy-lift and project cargo transport spanned more than 30 years, so it’s satisfying to see it redesigned, rebuilt and reinvigorated,” said Kevin Beardsley, executive director of the Duluth Seaway Port Authority. “This project would not have been possible without the resolve of past Port Authority leadership, and financial support from the U.S. Department of Transportation’s Maritime Administration and the Minnesota legislature.
“Duluth-Superior will probably always be known first as a bulk natural resources port, but it also became the Great Lakes’ heaviest-lift port when the Clure Terminal opened, and the expansion pier redevelopment enhanced our port’s capability as a breakbulk cargo-handling hub for North America’s midsection.”