The Port of Long Beach released a draft Initial Study today on a proposal by SA Recycling LLC to demolish its marine terminal facility on Pier T in the Port.

The Draft Initial Study/Mitigated Negative Declaration (IS/MND) concludes that the project would not have any significant or unmitigable environmental impacts. The draft study finds that potential impacts to biological, cultural and tribal cultural resources would be mitigated to less-than-significant levels. No other significant impacts are identified.