While the second wave of Covid19 was gaining ground in India, Total Movements, member to the Worldwide Project Consortium (WWPC) in India, picked up a critical Breakbulk ODC shipment from the manufacturer's works in India.

The move was fraught with challenges right from the beginning:
- Extreme width of the cargo. More than 7.5 m wide.
- Offset Centre of Gravity.
- Extremely tight delivery schedule.
- Dearth of suitable breakbulk tonnage due to high demand.
- Multi-modal transportation in the US, including Barge transportation and Roll-off.
Just when things looked to be going as per plan, calamity struck when the Suez canal got blocked just before our vessel could cross it. The wait for the canal to clear was quite unnerving as this was a time-bound shipment. Our entire schedule was pushed back by at least one week. However, with great co-operation from our on-shore counterparts in the US, we made up for the lost time by managing faster deliveries than expected.
This was our 5th breakbulk delivery to the USA with all cargo moved to the foundation site in the recent past.
Happy to say that with support from all the stakeholders involved, the cargo was delivered in a safe & timely manner.”