16 
American Journal of Transportation
American Journal of Transportation  
ajot.com
CONTACT US
SEE THE POTENTIAL. BE PART OF WHAT’S NEXT.
SEE THE POTENTIAL. BE PART OF WHAT’S NEXT.
www.portpascagoula.com
CHUCK CAMP
BUSINESS DEVELOPMENT MANAGER
[email protected]
Rhenus Projects Logistics delivers 
critical transformers for 
major Canadian industrial project
Rhenus Project Logistics 
teams in Canada and China 
have successfully transported 
more than 400 metric tons 
of transformer equipment in 
support of a major Canadian 
industrial project. The ship-
ments included two oversized 
transformers, each weighing 
80 metric tons, highlighting 
the specialized transportation 
and lifting solutions required 
throughout the project. Across 
multiple project phases, the 
company has managed a series 
of complex multimodal move-
ments from China to Canada, 
demonstrating its expertise in 
planning and executing over-
sized and heavy-lift cargo 
transportation. These deliv-
eries represented a series of 
essential infrastructure move-
ments requiring careful plan-
ning, specialized handling, 
and coordination across mul-
tiple transportation modes.
Each transformer required 
coordinated transfers between 
ocean vessels, rail networks 
and specialized heavy-haul 
road transport before final 
installation at site. From origin 
through final installation, Rhenus 
managed the movement of 
oversized cargo through a care-
fully coordinated multimodal 
transportation strategy. The 
operation concluded with the 
precise and safe placement of 
Rhenus provided comprehen-
sive project logistics services, 
including transportation plan-
ning, route assessments, multi-
modal coordination, heavy-haul 
transport management, and 
specialized lifting operations. 
This integrated approach ensured 
the successful execution of 
each shipment while main-
taining the highest standards 
the first-ever deployment of 
a Deck Carrier Vessel for 
large-scale BESS transpor-
tation, establishing a new 
benchmark for renewable 
energy logistics.
EXG managed the com-
plete engineering and logis-
tics execution, from advanced 
marine calculations, engineer-
ing approvals, and voyage 
planning to full charter vessel 
operations, synchronized port 
handling, customs clearance, and 
final site delivery. The scope 
included 
technical 
assess-
ments, stability analysis, deck 
strength calculations, stowage 
planning, lashing engineering, 
marine coordination, customs 
clearance, port handling, ocean 
transportation, inter-carting, and 
door delivery.
As the vessel was not 
equipped with conventional 
container shoes, EXG engi-
neered a customized cargo 
securing solution, including 
complete 
lashing 
arrange-
ments, sea-fastening method-
ology, and deck configuration 
specifically designed to meet 
Marine Warranty Surveyor 
(MWS) and insurance require-
ments. Comprehensive deck 
strength 
calculations, 
spe-
cialized cargo securing sys-
tems, and detailed engineering 
assessments ensured the safe 
transportation of hazardous 
BESS cargo throughout the 
ocean voyage, even under 
demanding sea conditions.
Upon arrival at India’s 
western maritime gateway, 
EXG executed synchronized 
discharge 
operations, 
cus-
toms clearance, inter-carting, 
and final inland transportation 
using its specialized hydraulic 
trailer fleet. The shipment was 
delivered safely and efficiently 
to one of the world’s largest 
hybrid clean energy projects, 
ensuring seamless last-mile 
connectivity for all 300 BESS 
units while maintaining the 
highest standards of opera-
tional safety and precision.
This 
landmark 
project 
showcases EXG’s ability to 
combine engineering excel-
lence, marine expertise, spe-
cialized heavy transport assets, 
and integrated project logistics 
to deliver complex, high-value 
renewable energy cargo safely, 
efficiently, and at an unprece-
dented scale. By executing the 
world’s biggest single ship-
ment of Battery Energy Storage 
System (BESS) and delivering 
it to one of the world’s largest 
hybrid clean energy projects, 
EXG continues to support 
the global energy transition 
through innovative logistics 
solutions that move the world’s 
most critical infrastructure with 
precision, safety, and reliability.
Rhenus Projects Logistics moved more than 400 metric tons of transformers from 
China to Canada for a major industrial project. © Rhenus Group
transformer equipment at its 
final destination, supporting 
the successful delivery and 
installation of critical infra-
structure components.
Throughout the project, 
(EXECUTES – continued 
from page 14)
(PROJECT – con-
tinued on page 18)

View this content as a flipbook by clicking here.