Ports don’t slow down and neither can our customers. When a reach stacker
needed to move down the Delaware River from one port to another, it wasn’t just a
transport job—it was a challenge that demanded the right plan, the right expertise,
and the right partner.
Complex logistics. Heavy equipment. Tight timelines.
Solved.
TAYLORNORTHEAST.COM
1-800-762-2500
out. Also, a temporary storage area was set up at 
Władysławowo while the job site itself was being 
prepared to receive the units.
Challenges
The onward land transport of the heavy trans-
formers presented a series of legal, technical and 
logistical challenges. Several existing bridges along 
the route were unable to carry the weight of the 
cargo, requiring a temporary flyover structure to be 
mounted on top of the existing infrastructure. The 
operation also had to be coordinated closely with 
multiple local Polish authorities, and carried out 
through harsh winter conditions, with temperatures 
dropping to -15°C.
Can Yılbaşı, Business Development Manager, 
COLI Istanbul, says: “We are very proud of our team 
and partners to have concluded this special and com-
plex in a successful manner and I want to thank GE 
Vernova’s team for their trust. Thanks to the flexi-
bility and close cooperation on both sides, we were 
able to overcome every obstacle along the way and 
deliver, as we say, a solution beyond the ordinary.
Felix Peinemann, Managing Director of COLI 
Group, says: “I am very proud of our team and this 
project. Moving 14 large and heavy units to the 
same site in 3 months in challeging conditions is 
not something any freight forwarder does every day. 
A key reason that the project came to a succesful 
conclusion can be found in the combined efforts of 
people and locations in the COLI Group; that really 
brings out the value for our clients”.
A Milestone Project
For COLI, the project represents a significant 
milestone: it’s the second time working directly 
with GE Vernova’s team in Poland, and a contribu-
tion to Baltica 2: a 1.5 GW offshore wind farm being 
developed by PGE Group and Ørsted in the Polish 
Baltic Sea. Scheduled for commissioning in 2027, 
Baltica 2 will be Poland’s largest-ever renewable 
energy investment, featuring 107 wind turbines with 
the capacity to power over 2.4 million households.
of safety, efficiency, and operational control.
“Major industrial developments depend on 
reliable and precisely executed logistics solutions 
to keep critical infrastructure projects moving for-
ward,” said Bassel Karameh, Country Manager, 
Project Logistics, Rhenus Canada. “This project 
highlights our ability to manage challenging mul-
timodal transportation operations across continents 
and deliver critical equipment safely from origin to 
final installation. Success required meticulous plan-
ning, strong coordination among multiple stakehold-
ers, and specialized heavy-lift expertise throughout 
every stage of the journey. “
The successful completion of these deliveries 
reinforces Rhenus Canada’s capabilities in han-
dling oversized and heavyweight cargo for indus-
trial, energy, infrastructure, and manufacturing 
projects, while demonstrating its ability to execute 
complex global supply chain solutions from origin 
to final destination.