Bahraini PCN members, Turk Heavy Transport have been involved in an ongoing project for Hyundai Heavy Industries over several months. The project, which was recently completed, consisted of 8 x 30mtn and 3 x 150mtn transformers for the Electricity and Water Authority. Turk Heavy Transport provided complete port-to-door logistics solutions for the project including road permissions, escort arrangements and road-works along the route to make the passage of trucks possible. The unloading operations were performed using a jack-and-skidding system. As a result of the expertise and efforts from Turk Heavy Transport, the shipments were delivered safely and on-time with their client very happy with their services.