Port of Longview

The Port of Longview’s Board of Commissioners passed an infrastructure focused budget which dedicates $10 million to rail expansion, berth revitalization and cargo handling investments. The Port of Longview’s Board of Commissioners’ 2019 Budget includes significant investments in the expansion of the Port’s Industrial Rail Corridor (IRC) and cargo handling infrastructure.

The IRC plays a critical role in the efficient movement of cargo throughout the region by connecting mainline rail directly with the Port. The expansion will add six additional tracks to the system, bringing the IRC to a total of eight tracks. This additional capacity will allow trains to move simultaneously, add storage for unit trains on sidings and accommodate the growing length of trains. Within the new budget, the Port plans to invest $800,000 towards permitting, environmental and engineering for the expansion. Additionally, the Port will pursue more than $200,000 in added upgrades to existing rail infrastructure within the Port.

Also in 2019, the Port will maintain its momentum on the Berth 4 Revitalization project.

Having recently completed the hazard mitigation assessment and demolition plan for the former Continental Grain silos, in 2019 the Port will conclude a vehicle and rail transportation analysis that will inform the movement of freight through the Port. The Port anticipates issuing a Request for Proposals for Berth 4 to interested parties in 2019.

On the cargo front, Commissioners approved upgrades to buildings and equipment that facilitate cargo handling on the waterfront. Improved bulk cargo environmental systems and controls make up much of the figure, which is rounded out by two new lift trucks to accommodate break bulk commodities.

Overall, the Port will invest approximately $10 million in infrastructure in 2019 and anticipates a strong year with operating revenues breaking $36 million.